{"id":14087,"date":"2020-11-11T14:52:51","date_gmt":"2020-11-11T13:52:51","guid":{"rendered":"https:\/\/www.jrailpass.com\/blog?p=14087"},"modified":"2023-05-22T16:40:54","modified_gmt":"2023-05-22T14:40:54","slug":"driverless-shinkansen","status":"publish","type":"post","link":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen","title":{"rendered":"Driverless Shinkansen Japan bullet trains to launch by 2028"},"content":{"rendered":"<p>JR East has announced that it will introduce <strong>driverless Shinkansen in Japan<\/strong> by the mid-2030s. JR Tokai could launch self-driving bullet trains even earlier, <strong>by 2028<\/strong>.<\/p>\n<p>As part of its Change 2027 program, JR East previously conducted a series of driverless Shinkansen test runs in late 2021, using a 12-car E7-series bullet train. JR East allocated an estimated budget of 200 million yen for the trials.<\/p>\n<p><!--more--><\/p>\n<p>The 5-kilometer trial runs took place in October and November 2021 <strong>in Niigata Prefecture<\/strong> northwest of Tokyo.<\/p>\n<p>They collected data to support JR East\u2019s long-term plan to introduce driverless <a href=\"https:\/\/www.jrailpass.com\/shinkansen-bullet-trains\">Shinkansen trains<\/a> on its rail network, which now has an implementation date.<\/p>\n<div id=\"toc_container\" class=\"toc_white no_bullets\"><p class=\"toc_title\">Table of Contents<\/p><ul class=\"toc_list\"><li><a href=\"#The_E7-series_Shinkansen\"><span class=\"toc_number toc_depth_1\">1<\/span> The E7-series Shinkansen<\/a><\/li><li><a href=\"#Which_lines_will_use_driverless_Shinkansen\"><span class=\"toc_number toc_depth_1\">2<\/span> Which lines will use driverless Shinkansen?<\/a><\/li><li><a href=\"#How_the_driverless_Shinkansen_works\"><span class=\"toc_number toc_depth_1\">3<\/span> How the driverless Shinkansen works<\/a><\/li><li><a href=\"#JR_Central_also_testing_driverless_Shinkansen_for_2028\"><span class=\"toc_number toc_depth_1\">4<\/span> JR Central also testing driverless Shinkansen for 2028<\/a><\/li><li><a href=\"#The_role_of_drivers_on_future_Shinkansen\"><span class=\"toc_number toc_depth_1\">5<\/span> The role of drivers on future Shinkansen<\/a><\/li><\/ul><\/div>\n<h2><span id=\"The_E7-series_Shinkansen\">The E7-series Shinkansen<\/span><\/h2>\n<p>The 2021 tests were carried out using the <strong>E7-series trains<\/strong>. This model of Shinkansen has been in operation on Japan\u2019s rail network since 2014.<\/p>\n<p>E7 series trains are based on the earlier E2 Shinkansen series, and <strong>combine futuristic and traditional design elements<\/strong> to give a distinctly &#8220;Japanese&#8221; feel both inside and out. The external roof is painted in a sky-blue color, while the sides are ivory white with copper and sky-blue lining.<\/p>\n<p>Although E7s do not reach the maximum Shinkansen speed of 275 per hour or the top <a href=\"https:\/\/www.jrailpass.com\/blog\/maglev-bullet-train\">Maglev train<\/a> speed of 375 miles per hour, these trains still <strong>have a top speed of 260 km per hour<\/strong>.<\/p>\n<p>Along with the standard and green cars present on Shinkansen, <strong>E7s also include one Gran Class Car<\/strong> for luxurious first-class travel. <a href=\"https:\/\/www.jrailpass.com\/blog\/shinkansen-gran-class#Inside_the_Gran_ClassAmenities_and_features\">Gran Class cars<\/a> offer travelers spacious seating and personalized attention by a host or hostess. They are fully equipped with the latest technology.<\/p>\n<p>E7 series trains are currently operated by drivers in central and eastern Japan, but were <strong>remotely piloted for the trials<\/strong>. The aim is for the trains to reach Grade of Automation 3 (GoA3), meaning that the train can fully drive itself.<\/p>\n<h2><span id=\"Which_lines_will_use_driverless_Shinkansen\">Which lines will use driverless Shinkansen?<\/span><\/h2>\n<p>The driverless Shinkansen tests have so far taken place on <strong>the northernmost section of the Joetsu Shinkansen Line<\/strong>, which is not used by commercial traffic. This 5km-long section runs from <a href=\"https:\/\/www.jrailpass.com\/blog\/niigata-travel-guide\">Niigata station<\/a> to the stock depot at Higashi-Niigata.<\/p>\n<p>The rail operator previously conducted similar tests on <a href=\"https:\/\/www.jrailpass.com\/blog\/yamanote-line\">Tokyo\u2019s Yamanote Line<\/a>, as well as with the \u201cAlfa-X\u201d prototype Shinkansen train.<\/p>\n<p>Now, JR East has confirmed that the automated trains will continue to run on the Joetsu Shinkansen line. They are considering implementing the trains <strong>on the Hokuriku line as well<\/strong>.<\/p>\n<p>The company has also said they <strong>plan to trial fully unattended trains (GoA4)<\/strong> before they can enter commercial use.<\/p>\n<p>JR East is <strong>eager to further roll out the automated Shinkansen<\/strong> as soon as possible to combat expected labor shortages, improve safety, and reduce human errors.<\/p>\n<p>In April 2023, the company signed a <strong>deal with West Japan Railway<\/strong> to work together to further develop automated systems and reduce costs<\/p>\n<h2><span id=\"How_the_driverless_Shinkansen_works\">How the driverless Shinkansen works<\/span><\/h2>\n<p>The driverless Shinkansen tests on the <a href=\"https:\/\/www.jrailpass.com\/blog\/joetsu-shinkansen-jr-pass\">Joetsu Line<\/a> <strong>evaluated 4 aspects of automatic train operation<\/strong>:<\/p>\n<ul>\n<li>The ability of the trains to initiate automatically<\/li>\n<li>Whether the ATO equipment enables the train to stop in a specific location<\/li>\n<li>The ability of the wayside and onboard control equipment to automatically accelerate and decelerate the train<\/li>\n<li>Whether the train could be brought to an emergency halt through remote means<\/li>\n<\/ul>\n<p>The tests <strong>were considered a success<\/strong>, although at the time JR East official Yasuaki Suzuki said \u201cWe need to continue to work on how to make a smooth stop at a station. There is still room for improvement\u201d.<\/p>\n<p>The tests <strong>also assessed whether high-definition video can be transmitted<\/strong> on the trains using local 5G new-generation telecoms networks and potentially be used on the national rail network in the future.<\/p>\n<h2><span id=\"JR_Central_also_testing_driverless_Shinkansen_for_2028\">JR Central also testing driverless Shinkansen for 2028<\/span><\/h2>\n<p>In addition to the driverless tests conducted by JR East, <strong>Central Japan Railway Co. (also known as JR Tokai)<\/strong> has also been conducting trials involving self-driving Shinkansen since November 2021.<\/p>\n<p>The company, which operates the <a href=\"https:\/\/www.jrailpass.com\/blog\/tokaido-shinkansen-jr-pass\">Tokaido Shinkansen line<\/a>, announced a <strong>successful test of a driverless N700S<\/strong> train on May 11, 2023. The trial run took place between Hamamatsu Station and Shizuoka Station in Shizuoka Prefecture.<\/p>\n<p>During the trial, the driver remained on standby to take control if necessary, but this was ultimately not required. The automatic train operating system (ATO) was able to fully navigate the track and arrive on time at its destination.<\/p>\n<p>Following the latest successful trial, <strong>JR Tokai hopes to implement the trains on its services by 2028<\/strong>.<\/p>\n<h2><span id=\"The_role_of_drivers_on_future_Shinkansen\">The role of drivers on future Shinkansen<\/span><\/h2>\n<p>While the introduction of driverless Shinkansen trains marks a significant technological advancement, it also raises <strong>questions about the role of drivers<\/strong> in the future.<\/p>\n<p>During the initial stages of implementing driverless trains, <strong>drivers will still be present on board to handle any emergencies<\/strong> or situations requiring manual intervention. This ensures a smooth transition and maintains the highest level of safety for passengers.<\/p>\n<p>In the long term, <strong>the role of drivers may evolve<\/strong> to focus more on customer service and assisting passengers, rather than operating the train.<\/p>\n<p>This shift in responsibilities will allow drivers to continue contributing to the Shinkansen experience, while <strong>the automated systems handle the train&#8217;s operation<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JR East has announced that it will introduce driverless Shinkansen in Japan by the mid-2030s. JR Tokai could launch self-driving bullet trains even earlier, by 2028. As part of its Change 2027 program, JR East previously conducted a series of driverless Shinkansen test runs in late 2021, using a 12-car E7-series bullet train. JR East allocated an estimated budget of 200 million yen for the trials.<\/p>\n","protected":false},"author":2,"featured_media":14088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"acf":{"bread_1":false,"bread_2":false,"bread_3":false,"bread_4":false,"bread_5":false,"bread_6":false,"bread_7":false,"bread_last":false,"custom_guide":"","pageresume":"JR East has announced it is conducting a series of driverless Shinkansen test runs on the Joestsu Line. Discover when these new trains will be implemented.","shortcodes":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.10 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Driverless Shinkansen Japan bullet trains to launch by 2028<\/title>\n<meta name=\"description\" content=\"Following a series of driverless Shinkansen tests, JR East has announced it will introduce these automated bullet trains in Japan in 2030. Learn more.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/posts\/14087\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Driverless Shinkansen Japan bullet trains to launch by 2028\" \/>\n<meta property=\"og:description\" content=\"Following a series of driverless Shinkansen tests, JR East has announced it will introduce these automated bullet trains in Japan in 2030. Learn more.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen\" \/>\n<meta property=\"og:site_name\" content=\"Japan Rail Pass Travel Blog | JRailPass\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-11T13:52:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-05-22T14:40:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.jrailpass.com\/blog\/wp-content\/uploads\/2020\/11\/e7-series-shinkansen.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"JRailPass\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen\"},\"author\":{\"name\":\"JRailPass\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#\/schema\/person\/0af8e877c84593eb4df7dcd8cc76bbb2\"},\"headline\":\"Driverless Shinkansen Japan bullet trains to launch by 2028\",\"datePublished\":\"2020-11-11T13:52:51+00:00\",\"dateModified\":\"2023-05-22T14:40:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen\"},\"wordCount\":849,\"publisher\":{\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#organization\"},\"articleSection\":[\"Trains &amp; Transportation\"],\"inLanguage\":\"en\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen\",\"url\":\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen\",\"name\":\"Driverless Shinkansen Japan bullet trains to launch by 2028\",\"isPartOf\":{\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#website\"},\"datePublished\":\"2020-11-11T13:52:51+00:00\",\"dateModified\":\"2023-05-22T14:40:54+00:00\",\"description\":\"Following a series of driverless Shinkansen tests, JR East has announced it will introduce these automated bullet trains in Japan in 2030. Learn more.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Japan Travel Blog\",\"item\":\"https:\/\/www.jrailpass.com\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Driverless Shinkansen Japan bullet trains to launch by 2028\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#website\",\"url\":\"https:\/\/www.jrailpass.com\/blog\/\",\"name\":\"Japan Rail Pass Travel Blog | JRailPass\",\"description\":\"Discover Japan by train with the Japan Rail Pass\",\"publisher\":{\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.jrailpass.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#organization\",\"name\":\"Japan Rail Pass S.L. - JRailPass.com\",\"url\":\"https:\/\/www.jrailpass.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.jrailpass.com\/blog\/wp-content\/uploads\/2017\/10\/logo.png\",\"contentUrl\":\"https:\/\/www.jrailpass.com\/blog\/wp-content\/uploads\/2017\/10\/logo.png\",\"width\":214,\"height\":60,\"caption\":\"Japan Rail Pass S.L. - JRailPass.com\"},\"image\":{\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.jrailpass.com\/blog\/#\/schema\/person\/0af8e877c84593eb4df7dcd8cc76bbb2\",\"name\":\"JRailPass\",\"sameAs\":[\"https:\/\/www.jrailpass.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Driverless Shinkansen Japan bullet trains to launch by 2028","description":"Following a series of driverless Shinkansen tests, JR East has announced it will introduce these automated bullet trains in Japan in 2030. Learn more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/posts\/14087","og_locale":"en_US","og_type":"article","og_title":"Driverless Shinkansen Japan bullet trains to launch by 2028","og_description":"Following a series of driverless Shinkansen tests, JR East has announced it will introduce these automated bullet trains in Japan in 2030. Learn more.","og_url":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen","og_site_name":"Japan Rail Pass Travel Blog | JRailPass","article_published_time":"2020-11-11T13:52:51+00:00","article_modified_time":"2023-05-22T14:40:54+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.jrailpass.com\/blog\/wp-content\/uploads\/2020\/11\/e7-series-shinkansen.jpg","type":"image\/jpeg"}],"author":"JRailPass","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen#article","isPartOf":{"@id":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen"},"author":{"name":"JRailPass","@id":"https:\/\/www.jrailpass.com\/blog\/#\/schema\/person\/0af8e877c84593eb4df7dcd8cc76bbb2"},"headline":"Driverless Shinkansen Japan bullet trains to launch by 2028","datePublished":"2020-11-11T13:52:51+00:00","dateModified":"2023-05-22T14:40:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen"},"wordCount":849,"publisher":{"@id":"https:\/\/www.jrailpass.com\/blog\/#organization"},"articleSection":["Trains &amp; Transportation"],"inLanguage":"en"},{"@type":"WebPage","@id":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen","url":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen","name":"Driverless Shinkansen Japan bullet trains to launch by 2028","isPartOf":{"@id":"https:\/\/www.jrailpass.com\/blog\/#website"},"datePublished":"2020-11-11T13:52:51+00:00","dateModified":"2023-05-22T14:40:54+00:00","description":"Following a series of driverless Shinkansen tests, JR East has announced it will introduce these automated bullet trains in Japan in 2030. Learn more.","breadcrumb":{"@id":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.jrailpass.com\/blog\/driverless-shinkansen#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Japan Travel Blog","item":"https:\/\/www.jrailpass.com\/blog"},{"@type":"ListItem","position":2,"name":"Driverless Shinkansen Japan bullet trains to launch by 2028"}]},{"@type":"WebSite","@id":"https:\/\/www.jrailpass.com\/blog\/#website","url":"https:\/\/www.jrailpass.com\/blog\/","name":"Japan Rail Pass Travel Blog | JRailPass","description":"Discover Japan by train with the Japan Rail Pass","publisher":{"@id":"https:\/\/www.jrailpass.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.jrailpass.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/www.jrailpass.com\/blog\/#organization","name":"Japan Rail Pass S.L. - JRailPass.com","url":"https:\/\/www.jrailpass.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/www.jrailpass.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.jrailpass.com\/blog\/wp-content\/uploads\/2017\/10\/logo.png","contentUrl":"https:\/\/www.jrailpass.com\/blog\/wp-content\/uploads\/2017\/10\/logo.png","width":214,"height":60,"caption":"Japan Rail Pass S.L. - JRailPass.com"},"image":{"@id":"https:\/\/www.jrailpass.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.jrailpass.com\/blog\/#\/schema\/person\/0af8e877c84593eb4df7dcd8cc76bbb2","name":"JRailPass","sameAs":["https:\/\/www.jrailpass.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/posts\/14087"}],"collection":[{"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/comments?post=14087"}],"version-history":[{"count":0,"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/posts\/14087\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/media\/14088"}],"wp:attachment":[{"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/media?parent=14087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/categories?post=14087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jrailpass.com\/blog\/wp-json\/wp\/v2\/tags?post=14087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}